About SEDA Malaysia Policies Feed-in Tariff (FiT) Statistics & Monitoring Download Directory Media Events & Trainings
Statistics & Monitoring
Trends of RE Technology Cost
RE Installed Capacities
Plants in Progress
Operational Plants
RE Generation
CO2 Avoidance
RE Capacity Map
FiAH Listing
Application Queue List
Qualified Listing


Home  »  Statistics & Monitoring  »  RE Installed Capacities  »  Operational Plants


Operational Plants
 

This table shows the total RE capacities (in MW) granted with Feed-in Approvals under the FiT mechanism and which have achieved the FiT Commencement Date.

Installed Capacity (MW) of Commissioned RE Installations

Year Biogas Biogas ( Landfill / Sewage ) Biomass Biomass ( Solid Waste ) Small Hydro Solar PV Geothermal Total
2012 0.00 2.10 25.90 0.00 11.00 4.00 0.00 43.00
2013 22.00 4.00 1.00 13.00 1.00 4.65 0.00 45.65
2014 37.00 5.50 7.00 0.00 0.00 2.08 3.00 54.58
2015 0.00 0.00 0.00 0.00 0.00 0.50 0.00 0.50
Cumulative 59.00 11.60 33.90 13.00 12.00 11.23 3.00 143.73
 
Copyright © 2025 SEDA Malaysia. All Rights Reserved.
Terms and Conditions of Use Links Enquiry Contact Us FAQs Sitemap