About SEDA Malaysia Policies Feed-in Tariff (FiT) Statistics & Monitoring Download Directory Media Events & Trainings
Download
Guidelines
FiT Guidelines
Power Systems Study Guideline
Guideline for ST provisional license
Forms
FiT Application Form
ST's License Form
Standardized REPPAs
Presentation Materials
Other Information


Home  »  Download  »  Forms  »  ST's License Form


ST 's License Form
 

The Energy Commission (Suruhanjaya Tenaga or ST) is a statutory body with the role to regulate the energy sector in Malaysia, specifically the electricity supply industry and piped gas supply industry in the Peninsular and Sabah. The Energy Commission is responsible to ensure that the supply of electricity and piped gas to consumers is reliable, safe and at reasonable prices.

"Public installation" is an installation carried out by the licensee to supply electricity to any person other than licensee: provided that licensee can use the electricity for specific purposes as long as the use is consistent with the terms of the licence.

Visit ST's website     |    Download ST's License Application Form

 
Copyright © 2025 SEDA Malaysia. All Rights Reserved.
Terms and Conditions of Use Links Enquiry Contact Us FAQs Sitemap