FiT Rates for Biogas (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 10MW
0.7000
(ii)
above 10MW and up to and including 20MW
0.6000
(i)
up to and including 4MW
0.2000
(ii)
above 4MW and up to and including 10MW
0.1905
(iii)
above 10MW and up to and including 30MW
0.1800
(i)
up to and including 4MW
0.3165
(ii)
above 4MW and up to and including 10MW
0.2965
(iii)
above 10MW and up to and including 30MW
0.2772
(i)
up to and including 2MW
0.3600
(ii)
above 2MW and up to and including 8MW
0.3700
(iii)
above 8MW and up to and including 10MW
0.3800
(iv)
above 10MW and up to and including 30MW
0.3900
(i)
up to and including 4MW
0.3168
(ii)
above 4MW and up to and including 10MW
0.2970
(iii)
above 10MW and up to and including 30MW
0.2772
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3200
(ii)
above 4MW and up to and including 10MW
0.3000
(iii)
above 10MW and up to and including 30MW
0.2800
(i)
up to and including 4MW
0.3200
(ii)
above 4MW and up to and including 10MW
0.3000
(iii)
above 10MW and up to and including 30MW
0.2800
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0400
(ii)
use of locally manufactured or assembled gas engine technology
+0.0050
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0013
(ii)
use of locally manufactured or assembled gas engine technology
+0.0011
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0198
(ii)
use of locally manufactured or assembled gas engine technology
+0.0099
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0013
(ii)
use of locally manufactured or assembled gas engine technology
+0.0001
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0198
(ii)
use of locally manufactured or assembled gas engine technology
+0.0099
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0200
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0200
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
FiT Rates for Biogas ( Landfill / Sewage ) (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4MW
0.2000
(ii)
above 4MW and up to and including 10MW
0.1905
(iii)
above 10MW and up to and including 30MW
0.1800
(i)
up to and including 4MW
0.3165
(ii)
above 4MW and up to and including 10MW
0.2965
(iii)
above 10MW and up to and including 30MW
0.2772
(i)
up to and including 4MW
0.3168
(ii)
above 4MW and up to and including 10MW
0.2970
(iii)
above 10MW and up to and including 30MW
0.2772
(i)
up to and including 4MW
0.3184
(ii)
above 4MW and up to and including 10MW
0.2985
(iii)
above 10MW and up to and including 30MW
0.2786
(i)
up to and including 4MW
0.3200
(ii)
above 4MW and up to and including 10MW
0.3000
(iii)
above 10MW and up to and including 30MW
0.2800
(i)
up to and including 4MW
0.3200
(ii)
above 4MW and up to and including 10MW
0.3000
(iii)
above 10MW and up to and including 30MW
0.2800
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0010
(ii)
use of locally manufactured or assembled gas engine technology
+0.0010
(iii)
use of landfill or sewage gas as fuel source
+0.0010
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0198
(ii)
use of locally manufactured or assembled gas engine technology
+0.0099
(iii)
use of landfill or sewage gas as fuel source
+0.0771
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0198
(ii)
use of locally manufactured or assembled gas engine technology
+0.0099
(iii)
use of landfill or sewage gas as fuel source
+0.0771
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0199
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
(iii)
use of landfill or sewage gas as fuel source
+0.0786
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0200
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
(iii)
use of landfill or sewage gas as fuel source
+0.0800
(i)
use of gas engine technology with electrical efficiency of above 40%
+0.0200
(ii)
use of locally manufactured or assembled gas engine technology
+0.0100
(iii)
use of landfill or sewage gas as fuel source
+0.0800
FiT Rates for Biomass (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 10MW
0.3000
(ii)
above 10MW and up to and including 20MW
0.2800
(iii)
above 20MW and up to and including 30MW
0.2600
(i)
up to and including 10MW
0.3500
(ii)
above 10MW and up to and including 20MW
0.3000
(iii)
above 20MW and up to and including 30MW
0.2500
(i)
up to and including 10MW
0.3069
(ii)
above 10MW and up to and including 20MW
0.2871
(iii)
above 20MW and up to and including 30MW
0.2673
(i)
up to and including 10MW
0.3085
(ii)
above 10MW and up to and including 20MW
0.2886
(iii)
above 20MW and up to and including 30MW
0.2687
(i)
up to and including 10MW
0.3100
(ii)
above 10MW and up to and including 20MW
0.2900
(iii)
above 20MW and up to and including 30MW
0.2700
(i)
up to and including 10MW
0.3100
(ii)
above 10MW and up to and including 20MW
0.2900
(iii)
above 20MW and up to and including 30MW
0.2700
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use of gasification technology
+0.0190
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0090
(iii)
use of locally manufactured or assembled gasification technology
+0.0080
(i)
use of gasification technology
+1.0000
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.8000
(i)
use of gasification technology
+0.0198
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0099
(iii)
use of locally manufactured or assembled gasification technology
+0.0099
(i)
use of gasification technology
+0.0199
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0100
(iii)
use of locally manufactured or assembled gasification technology
+0.0100
(i)
use of gasification technology
+0.0200
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0100
(iii)
use of locally manufactured or assembled gasification technology
+0.0100
(i)
use of gasification technology
+0.0200
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0100
(iii)
use of locally manufactured or assembled gasification technology
+0.0100
FiT Rates for Biomass ( Solid Waste ) (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 10MW
0.3000
(ii)
above 10MW and up to and including 20MW
0.2800
(iii)
above 20MW and up to and including 30MW
0.2600
(i)
up to and including 10MW
0.3069
(ii)
above 10MW and up to and including 20MW
0.2871
(iii)
above 20MW and up to and including 30MW
0.2673
(i)
up to and including 10MW
0.3085
(ii)
above 10MW and up to and including 20MW
0.2886
(iii)
above 20MW and up to and including 30MW
0.2687
(i)
up to and including 10MW
0.3100
(ii)
above 10MW and up to and including 20MW
0.2900
(iii)
above 20MW and up to and including 30MW
0.2700
(i)
up to and including 10MW
0.3100
(ii)
above 10MW and up to and including 20MW
0.2900
(iii)
above 20MW and up to and including 30MW
0.2700
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use of gasification technology
+0.0190
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0090
(iii)
use of locally manufactured or assembled gasification technology
+0.0080
(iv)
use of municipal solid waste as fuel source
+0.0060
(i)
use of gasification technology
+0.0198
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0099
(iii)
use of locally manufactured or assembled gasification technology
+0.0099
(iv)
use of municipal solid waste as fuel source
+0.0964
(i)
use of gasification technology
+0.0199
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0100
(iii)
use of locally manufactured or assembled gasification technology
+0.0100
(iv)
use of municipal solid waste as fuel source
+0.0982
(i)
use of gasification technology
+0.0200
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0100
(iii)
use of locally manufactured or assembled gasification technology
+0.0100
(iv)
use of municipal solid waste as fuel source
+0.1000
(i)
use of gasification technology
+0.0200
(ii)
use of steam-based electricity generating systems with overall efficiency of above 14%
+0.0100
(iii)
use of locally manufactured or assembled gasification technology
+0.0100
(iv)
use of municipal solid waste as fuel source
+0.1000
FiT Rates for Small Hydro (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 10MW
0.2400
(ii)
above 10MW and up to and including 30MW
0.2300
(i)
up to and including 10MW
0.2400
(ii)
above 10MW and up to and including 30MW
0.2300
(i)
up to and including 10MW
0.2400
(ii)
above 10MW and up to and including 30MW
0.2300
(i)
up to and including 10MW
0.2400
(ii)
above 10MW and up to and including 30MW
0.2300
FiT Rates for Housing Developer (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4kW
1.0411
(ii)
above 4kW and up to and including 24kW
1.0157
(iii)
above 24kW and up to and including 72kW
0.9988
(iv)
above 72kW and up to and including 1MW
0.9649
(v)
above 1MW and up to and including 10MW
0.8041
(vi)
above 10MW and up to and including 30MW
0.7194
(i)
up to and including 4kW
1.2200
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0800
(iv)
above 72kW and up to and including 1MW
1.0500
(v)
above 1MW and up to and including 10MW
0.8500
(vi)
above 10MW and up to and including 30MW
0.7000
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.2201
(ii)
use as building materials
+0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0254
(iv)
use of locally manufactured or assembled solar inverters
+0.0085
(i)
use as installation in buildings or building structures
+0.2200
(ii)
use as building materials
+0.2100
(iii)
use of locally manufactured or assembled solar PV modules
+0.0800
(iv)
use of locally manufactured or assembled solar inverters
+0.0700
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
FiT Rates for Solar PV (Non-individual (> 500 Kw)) (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 12kW
1.2000
(ii)
above 12kW and up to and including 72kW
1.1120
(iii)
above 72kW and up to and including 180kW
1.1000
(iv)
above 180kW and up to and including 425kW
1.0000
(v)
above 425kW and up to and including 1MW
0.9000
(vi)
above 1MW and up to and including 5MW
0.8200
(vii)
above 5MW and up to and including 10MW
0.8000
(i)
up to and including 4kW
1.0411
(ii)
above 4kW and up to and including 24kW
1.0157
(iii)
above 24kW and up to and including 72kW
0.9988
(iv)
above 72kW and up to and including 1MW
0.9649
(v)
above 1MW and up to and including 10MW
0.8041
(vi)
above 10MW and up to and including 30MW
0.7194
(i)
up to and including 4kW
1.2200
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0800
(iv)
above 72kW and up to and including 1MW
1.0500
(v)
above 1MW and up to and including 10MW
0.8500
(vi)
above 10MW and up to and including 30MW
0.7000
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.3000
(ii)
use as building materials
+0.2000
(iii)
use of locally manufactured or assembled solar PV modules
+0.2500
(i)
use as installation in buildings or building structures
+0.2201
(ii)
use as building materials
+0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0254
(iv)
use of locally manufactured or assembled solar inverters
+0.0085
(i)
use as installation in buildings or building structures
+0.2200
(ii)
use as building materials
+0.2100
(iii)
use of locally manufactured or assembled solar PV modules
+0.0800
(iv)
use of locally manufactured or assembled solar inverters
+0.0700
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
FiT Rates for Community (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4kW
1.2200
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0800
(iv)
above 72kW and up to and including 1MW
1.0500
(v)
above 1MW and up to and including 10MW
0.8500
(vi)
above 10MW and up to and including 30MW
0.7000
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.2200
(ii)
use as building materials
+0.2100
(iii)
use of locally manufactured or assembled solar PV modules
+0.0800
(iv)
use of locally manufactured or assembled solar inverters
+0.0700
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
FiT Rates for Geothermal (16 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 10MW
0.8000
(ii)
above 10MW and up to and including 20MW
0.7000
(iii)
above 20MW and up to and including 30MW
0.6000
FiT Rates for Solar PV (Individual) (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 4kW
1.0500
(ii)
above 4kW and up to and including 24kW
1.0750
(i)
up to and including 4kW
1.0184
(ii)
above 4kW and up to and including 12kW
0.9936
(i)
up to and including 4kW
1.0411
(ii)
above 4kW and up to and including 24kW
1.0157
(iii)
above 24kW and up to and including 72kW
0.9988
(iv)
above 72kW and up to and including 1MW
0.9649
(v)
above 1MW and up to and including 10MW
0.8041
(vi)
above 10MW and up to and including 30MW
0.7194
(i)
up to and including 4kW
1.2200
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0800
(iv)
above 72kW and up to and including 1MW
1.0500
(v)
above 1MW and up to and including 10MW
0.8500
(vi)
above 10MW and up to and including 30MW
0.7000
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.0980
(ii)
use as building materials
+0.1200
(iii)
use of locally manufactured or assembled solar PV modules
+0.1350
(iv)
use of locally manufactured or assembled solar inverters
+0.1890
(i)
use as installation in buildings or building structures
+0.2153
(ii)
use of locally manufactured or assembled solar PV modules
+0.0500
(i)
use as installation in buildings or building structures
+0.2201
(ii)
use as building materials
+0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0254
(iv)
use of locally manufactured or assembled solar inverters
+0.0085
(i)
use as installation in buildings or building structures
+0.2200
(ii)
use as building materials
+0.2100
(iii)
use of locally manufactured or assembled solar PV modules
+0.0800
(iv)
use of locally manufactured or assembled solar inverters
+0.0700
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
FiT Rates for Solar PV (Non-individual (≤ 500 Kw)) (21 years from FiT Commencement Date)
Description of Qualifying Renewable Energy Installation
FiT Rates (RM per kWh)
(a) Basic FiT rates having installed capacity of :
(i)
up to and including 12kW
1.1000
(ii)
above 12kW and up to and including 24kW
1.0100
(iii)
above 24kW and up to and including 72kW
1.0000
(iv)
above 72kW and up to and including 500kW
0.9000
(i)
up to and including 4kW
1.0411
(ii)
above 4kW and up to and including 24kW
1.0157
(iii)
above 24kW and up to and including 72kW
0.9988
(iv)
above 72kW and up to and including 1MW
0.9649
(v)
above 1MW and up to and including 10MW
0.8041
(vi)
above 10MW and up to and including 30MW
0.7194
(i)
up to and including 4kW
1.2200
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0800
(iv)
above 72kW and up to and including 1MW
1.0500
(v)
above 1MW and up to and including 10MW
0.8500
(vi)
above 10MW and up to and including 30MW
0.7000
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.1316
(ii)
above 4kW and up to and including 24kW
1.1040
(iii)
above 24kW and up to and including 72kW
1.0856
(iv)
above 72kW and up to and including 1MW
1.0488
(v)
above 1MW and up to and including 10MW
0.8740
(vi)
above 10MW and up to and including 30MW
0.7820
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(i)
up to and including 4kW
1.2300
(ii)
above 4kW and up to and including 24kW
1.2000
(iii)
above 24kW and up to and including 72kW
1.1800
(iv)
above 72kW and up to and including 1MW
1.1400
(v)
above 1MW and up to and including 10MW
0.9500
(vi)
above 10MW and up to and including 30MW
0.8500
(b) Bonus FiT rates having the following criteria (one or more) :
(i)
use as installation in buildings or building structures
+0.3000
(ii)
use as building materials
+0.2100
(iii)
use of locally manufactured or assembled solar PV modules
+0.2300
(iv)
use of locally manufactured or assembled solar inverters
+0.0098
(i)
use as installation in buildings or building structures
+0.2201
(ii)
use as building materials
+0.2116
(iii)
use of locally manufactured or assembled solar PV modules
+0.0254
(iv)
use of locally manufactured or assembled solar inverters
+0.0085
(i)
use as installation in buildings or building structures
+0.2200
(ii)
use as building materials
+0.2100
(iii)
use of locally manufactured or assembled solar PV modules
+0.0800
(iv)
use of locally manufactured or assembled solar inverters
+0.0700
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2392
(ii)
use as building materials
+0.2300
(iii)
use of locally manufactured or assembled solar PV modules
+0.0276
(iv)
use of locally manufactured or assembled solar inverters
+0.0092
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
(i)
use as installation in buildings or building structures
+0.2600
(ii)
use as building materials
+0.2500
(iii)
use of locally manufactured or assembled solar PV modules
+0.0300
(iv)
use of locally manufactured or assembled solar inverters
+0.0100
The e-FiT system has been enhanced with a more user-friendly portal; displaying automatic real-time update of RE Quota on a separate RE Quota webpage. Please click here to get the latest update of RE Quota available for any Feed-in Approval application and thereafter there is no necessity to refresh the RE Quota webpage.